Methodology

How we build an estimate

Every calculator shows a planning range, not a quote. This page explains where the numbers come from, how they are combined, and where the limits are.

Last reviewed: October 2026.

What the numbers are

The calculators produce a low-to-high planning band for a typical project. They are built from published material prices, contractor labor ranges, and project formulas. They are not live supplier quotes, contractor bids, or guarantees.

A range is intentional. Local labor, site access, material grade, permits, and schedule can move a real bid by 20–40 percent or more. A precise-looking single number would hide that uncertainty.

How a range is built

  1. Material cost. Unit prices for the material, fasteners, and consumables, multiplied by the quantity from your dimensions. Waste is added where cuts and breakage are normal.
  2. Labor. Published contractor ranges, expressed per square foot, linear foot, or hour. Fence estimates also apply a state cost index; landscape materials are priced nationally because bulk soil and stone markets vary less predictably.
  3. Project logic. Gate posts, concrete volume, base depth, stairs, removal, and a permit allowance are added from the dimensions you enter, not from a fixed package.
  4. Rounding. The result is rounded to a planning band. The low and high ends are not statistical confidence intervals.

Source hierarchy

We prefer sources in this order: industry associations and public labor data, then published cost guides, then retailer listings. Each calculator page links to the source categories used for that page.

Review status

Each source block is labeled either planning estimate or calibrated. A planning estimate means the range is a defensible starting point but has not yet been checked against two independent sources for every line. Calibrated means the line items have been checked against at least two sources and a dated record is kept in our price log.

We review material prices quarterly, labor and permit ranges annually, and update a page when a reader sends a credible local correction.

What the numbers do not include

  • Engineering, architectural, or soil reports.
  • Permit fees that vary by jurisdiction, beyond a flat allowance.
  • HOA fees, surveys, easements, or property-line work.
  • Taxes, financing, contractor markups, or change orders.
  • Rock, slopes, drainage, tree removal, or other site conditions.
  • Premium finishes, custom hardware, or design fees.

Corrections

If a range is materially off in your market, send the source (a local quote, a supplier listing, or a permit fee schedule) to[email protected]. We review corrections and update the page when the source holds up.